Looking for a wetland delineation in Jacinto City, TX? Describe your project once and up to three wetland consultants who work in Jacinto City and Harris County get back to you with a quote. It's free and there is no obligation.
Jacinto City is home to about 9,431 people (2024 Census Bureau estimate), a shrinking community (−1.9% since 2020). With 5,088 people per sq mi, it is a densely built-up area. Low-lying lots, stream corridors and former farmland can hold wetlands that must be mapped before building.
Jacinto City at a glance
- Population (Census Bureau estimate, 2024)
- 9,431 (−1.9% since 2020)
- Rank in Texas
- 264th of 1,224 cities and towns
- Land area
- 1.9 sq mi
- Population density
- 5,088 people per sq mi (densely built-up)
- Type
- City (Jacinto City city)
- Main county
- Harris County
What to check before hiring in Jacinto City
- Rules: in Texas, wetlands can be regulated by the Corps of Engineers, the state and the county, each with its own rules and buffers.
- Season: some indicators are only reliable in the growing season; ask the consultant when to schedule.
- Survey: the delineated boundary is usually located by a land surveyor for the site plan.
- Price drivers: site size, vegetation, access and whether permitting is included.
Useful official resources
-
EPA: Section 404
The federal wetland permit program.
-
U.S. Army Corps of Engineers
Regulatory program and district offices.
Services available in Jacinto City
-
Wetland delineation
Field delineation of wetland boundaries following the Corps of Engineers manual, with flags and a report.
-
Wetland permitting support
Jurisdictional determination and permit application (Section 404, state or local) for work near wetlands.
Frequently asked questions in Jacinto City
How much does a wetland delineation cost in Jacinto City, TX?
It depends on the size of the site, the vegetation and the report required. Describe your land: consultants who serve Jacinto City send a proposal.
How long does it take?
Field work often takes a day or two; agency review of a jurisdictional determination can take months.
Can I build if there is a wetland?
Often yes, by avoiding it or obtaining the required permits and mitigation.
Which wetland consultants will contact me?
Up to three independent wetland consultants who serve Jacinto City and the surrounding area, chosen for the service you need. Your details are shared only with your consent.
Source: U.S. Census Bureau, Population Estimates Program (Vintage 2024) and Gazetteer Files (public domain), imported on 10/31/2026. Figures describe the incorporated place or county as published; they are shown for information only.